
Add to Cart
Custom CNC Machining PMMA Plastic Injection Mold Small Car Spare Parts
Custom PMMA Injection Molded Small Part China Mould Plastic Manufacturer car Spare Parts
Feature of Prototype Plastic Molding:
- Plastic injection mold
- cover or Lid parts
- PP material
- 1*4 injection mold
- H13 (HRC48-52) Steel
- YUDO Hot runner
- Full hot runner
- Automatically running
- HASCO standard
- Short cycle time
1, Start from part design analysis.
2, Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3, If product is complex, moldflow report will be present as well.
4, In house mold making shop ensure you mold quality under well control.
5, Normally it takes 20-40 days to make mold, precise time depends on part design.
Application Of Plastic Injection Mold
Use for machinery
Use for electronic
Use for automotive
Use for information technology industry
Use for Space industry
Use for Medical industry
Use for Energy industry
Plastic Injection Molding advantages:
1. Professional design team
2. Professional mold design team
3. Professional mold making machines
4. Professional mould and product QC engineering team
5. Rich mold making experience with different clients from various country
Plastic Mold (Moulds) | Description |
1. 3D Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2. Negotiations | Including the price of molds, molds sizes, material |
3. Purchasing Order | After the customer confirming the mold design and quotation. |
4. Making mold(moulds) | Confirm drawing, start to do DFM, mold flows and mold detail agreed |
5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
6. sample shoot | We provide the molds test samples for confirmation (about 10-15 piece), then, |
7. Package | Wooden case for moulds, cartons for parts, or as your requirement. |
8. Delivery | deliver goods by air or by sea. |
FAQ
Q: Are you trading company or manufacturer?
A: We are a manufacturer. We can do OEM/ODM business.
Q: How long is your delivery time?
A: Group buying delivery time: 15-20 days; General delivery time: 3-7 days.
Q: What is your terms of payment?
A: 50% as deposit, and 50% before delivery.
Q: How to buy your products?
A: You can buy the products from our company directly. Normally the procedure is sign the contract, payment by T/T, Contact the shipping company to delivery the goods to your country.
Q: What is the warranty?
A: If there is no feedback within seven days after receiving the goods, we will consider it as qualified.